GSL’s parking lot by the lines
Corey Johnson of All-Star Asphalts in Willmar painted lines dividing parking spaces at GSL’s newly-resurfaced parking lot Friday afternoon. Saturday, the area received 1.25 inches of rain and the water drained off the lot into adjacent ponds as intended. The new lot was opened for use Monday, Aug. 12. The project is expected to be completed later this month.